Great Lakes Fishery Commission Great Lakes Fishery Commissionabout usmeeting schedule
Protecting Our Fishery
Sea Lamprey ControlFish ManagementScience ProgramLake CommitteesPublications & LinksMultimedia RoomBoards & Committees

Lake Erie Committee - Habitat Task Group

<<< Back to Lake Erie Habitat-Project Inventory HOME Page

East Basin Habitat-Related Project Inventory

Click on a region of the map or a link below to view a spatial inventory of projects in that region.

By Watershed:

Big Creek - Buffalo-Eighteenmile - Cattaraugus - Chautauqua-Conneaut - Lower Grand -
Niagara
- Niagara River- Upper Grand

 


Eastern Basin

Big Creek

Project Title Project Type Basin Waterbody(ies) Status

Long Point Bay Ecological Assessment Habitat monitoring and East basin n/a Pending Funding; Spring and

evaluation Summer 2007- 2009

Location: Lake Erie Eastern Basin North shore

Description: To assess the status of the coastal wetland complex located within Long Point. Analysis parameters will include: water and sediment quality, vegetation

diversity and richness, aquatic invertebrate diversity and IBI scores, fish , marsh bird and amphibian diversity, tributary water quality and landuse impacts.

The results of this study will be used to guide stewardship within the immediate area.

Lead Agency: LEMU- OMNR

Contact: J. Gilbert or K. Oldenburg; OMNR Lake Erie Management Unit, P.O. Box 429 Port Dover, ON, N0A 1N0

Partners:

Links:

Documents

Big Creek, Lower Grand

Project Title Project Type Basin Waterbody(ies) Status

East Basin Rehabilitation Plan: Habitat monitoring and East basin n/a April 2000 - Dec 2004.

Habitat component evaluation Reporting completed in 2005

Location: North Shore of Eastern Basin

Description: A component of a 5-yr fisheries management plan that involves fisheries and habitat surveys in the nearshore waters and lower section of tributaries in the

Ontario waters of the eastern basin from Long Point to the Niagara River. The intent of this component is to link key species (yellow perch and walleye) and

the fish community with habitat types in order to identify sites with potential for habitat rehabilitation.

Lead Agency: OMNR (LEMU)

Contact: K. Oldenburg, OMNR Lake Erie Management Unit, P.O. Box 429 Port Dover, ON, N0A 1N0

Partners: EC, OCFA, OFAH

Links:

Documents Reference #1

Buffalo-Eighteenmile

Project Title Project Type Basin Waterbody(ies) Status

Buffalo River Walleye introductions Rehabilitation Projects East basin n/a Project on hold due to disease

(Implementation) issues with rearing walleye eggs.

Location: Buffalo R., NY

Description: Stocking of walleye fingerlings in the Buffalo River in an attempt to establish a breeding walleye population . Project will also monitor water quality and

thermal profiles, and evaluate the overall habitat for possible future improvements.

Lead Agency: NYSDEC

Contact: J. Markham, Lake Erie Fisheries Unit – NYSDEC, Dunkirk, NY 14048-1031

Partners: Southtowns Walleye Association, Erie County Fish Advisory Board

Links:

Documents

Cattaraugus

Project Title Project Type Basin Waterbody(ies) Status

Cattaraugus Creek Migratory Access Rehabilitation Projects East basin n/a 2005 to completion

Improvement (Implementation)

Location: Springville, NY

Description: This is the initial phase of an investigations into feasibility, costs, and benefits associated with fish passage and sea lamprey attraction /traps at a dam in

Springville, NY on Cattaraugus Ck. Results of this initial study will determine future direction of this project.

Lead Agency: US Army Corp of Engineers, Erie County

Contact: J. Markham, Lake Erie Fisheries Unit – NYSDEC, Dunkirk, NY 14048-1031

Partners: NYSDEC

Links:

Documents


Spooner Ck. Rehabilitation Project Rehabilitation Projects East basin Spooner Creek Completed

(Implementation)

Location: Springville, NY

Description: Bank stabilization project to minimize erosion, stabilize the creek bed, and improve instream habitat and cover. The project mainly involves tree plantings,

but may also include the construction of cribs on high erosion areas.

Lead Agency: NYSDEC

Contact: J. Markham, Lake Erie Fisheries Unit – NYSDEC, Dunkirk, NY 14048-1031

Partners: Western NY Chapter of TU

Links:

Documents

Chautauqua

Project Title Project Type Basin Waterbody(ies) Status

Chautauqua Creek Migratory Access Rehabilitation Projects East basin n/a Completed in July 2012

Improvement (Implementation)

Location: Westfield, NY

Description: The is a GLFER project and will provide passage at two fish passage barriers, opening up an additional 10 miles of high quality spawning habitat for steelhead

and other resident stream fishes.

Lead Agency: US Army Corp of Engineers, Erie County

Contact: J. Markham, Lake Erie Fisheries Unit – NYSDEC, Dunkirk, NY 14048-1031

Partners: NYSDEC

Links:

Documents

Chautauqua-Conneaut

Project Title Project Type Basin Waterbody(ies) Status

Chautauqua Creek Fish Passage Rehabilitation Projects Central basin n/a 2006 to completion

Project (Implementation)

Location: Chautauqua Creek, NY

Description: This is the initial phase of an investigations into feasibility, costs, and benefits associated with fish passage at a pair of dams near Westfield, NY on

Chautauqua Ck. Results of this initial study will determine future direction of this project.

Lead Agency: US Army Corp of Engineers, Erie County, Village of Westfield, USFWS, and NY Rivers United

Contact: J. Markham, Lake Erie Fisheries Unit – NYSDEC, Dunkirk, NY 14048-1031

Partners: NYSDEC, Red House Chapter of Trout Unlimited

Links:

Documents


Crooked Creek Holliday Site Stream Rehabilitation Projects: East-Central Crooked Creek 2011

Enhancement Implementing strategies,

Location: Holliday Farms

Description: This project is a habitat improvement effort.

Lead Agency: PA Fish and Boat Commission

Contact: K. Anderson, Division of Habitat Management, Tionesta Pa 16356

Partners: NRCS Property Owner

Links:

Documents Design


East Branch of Conneaut Creek Rehabilitation Projects: East-Central East Branch of Conneaut Creek, PA Completed 2010

Albion Park Stream Enhancement Implementing strategies,

Location: Albion Park

Description: This project is a habitat improvement effort.

Lead Agency: PA Fish and Boat Commission

Contact: K. Anderson, Division of Habitat Management, Tionesta Pa 16354

Partners: Albion Sportsmans Club

Links:

Documents Design and Permits


East Branch of Conneaut Creek Rehabilitation Projects: East-Central East Branch of Conneaut Creek, PA 2009 Ongoing

Impoundments Preliminary Implementing strategies,

Restoration Plan

Location: Erie County

Description: The PRP has been completed for this project and the project has advanced to the feasibility, design phase. The project involves improving fish passage to a

reach of East Branch of Conneaut Creek by the removal of two dams near Albion PA, restoration of the stream reach impacted by the dam, and the

construction of a sea lamprey control barrier. Results of this feasibility and design phase will determine future direction of this project

Lead Agency: PA Fish and Boat Commission

Contact: K. Anderson, Division of Habitat Management, Tionesta Pa 16353

Partners: US Army Crop of Engineers, Albion Sportsmen's Club

Links:

Documents Final PRP, Feasibility Study


Elk Creek, Folleys End Stream Rehabilitation Projects: East-Central Elk Creek 2011

Enhancement Implementing strategies,

Location: Folleys End

Description: This project is a habitat improvement effort.

Lead Agency: PA Fish and Boat Commission

Contact: K. Anderson, Division of Habitat Management, Tionesta Pa 16356

Partners: NRCS Property Owner

Links:

Documents Design


Elk Creek, McKean Reach Stream Rehabilitation Projects: East-Central Elk Creek 2011 ongoing

Enhancement Implementing strategies,

Location: Huya Site

Description: The PRP is under development for this project with anticipation to advance to the feasibility / design phase in 2011.

Lead Agency: PA Fish and Boat Commission

Contact: K. Anderson, Division of Habitat Management, Tionesta Pa 16356

Partners: US Army Crop of Engineers,

Links:

Documents PRP


Formile Creek Fish Passage Rehabilitation Projects: East-Central Four Mile Creek, PA 2010 Ongoing

Implementing strategies,

Location: Cassidy Park Millcreek Township

Description: The project will provide passage at two fish passage barriers.

Lead Agency: PA Fish and Boat Commission

Contact: K. Anderson, Division of Habitat Management, Tionesta Pa 16356

Partners: Lawrence Park Township, DCNR, CZM, Lawrence Park Golfcourse, USF&WS

Links:

Documents

Lower Grand

Project Title Project Type Basin Waterbody(ies) Status

Evaluation of Southern Grand River Habitat monitoring and East basin n/a 2004. Final Reporting Complete

wetlands between Cayuga and evaluation 2005

Dunnville

Location: Bottom 42km of Grand River, Ontario

Description: Ten wetlands were evaluated in the summer of 2004 for water and sediment quality along with vegetation and aquatic invertebrate and fish diversity and

richness. Surveys were also conducted to determine wetland and river basin bathymetry elevations tied to geodetic benchmarks to assess potential impacts

due to a Dunnville Dam removal scenario.

Lead Agency: LEMU- OMNR

Contact: J. Gilbert or K. Oldenburg; OMNR Lake Erie Management Unit, P.O. Box 429 Port Dover, ON, N0A 1N0

Partners: EC

Links:

Documents Reference #4


Grand River (Fairchilds Creek) Rehabilitation Projects East basin n/a Ongoing

Stewardship Initiative (Implementation)

Location: Grand River, Ontario (eastern basin)

Description: Stewardship initiatives in Brant and Haldimand Counties to implement “Best Management Practices for agricultural land. Includes the monitoring of baseline

and anticipated temporal improvements in water quality (esp. P, N, and TSS) as land use practices change in the watershed. Initial focus will be on the

subwatershed of Fairchilds Creek., other areas getting attention as impacts are better understood.

Lead Agency: OMNR (Brant Stewardship Council)

Contact: D. Depuydt, OMNR, 353 Talbot St., W. Aylmer, Ont. N5H 2S8

Partners: Environment Canada, DFO, GRCA, MOE

Links:

Documents


Grand River Wetlands: Process Rehabilitation Projects East basin n/a Assessment Complete; Working

Wetland Feasibility Study (Implementation) group established 2006; Ongoing

Location: Grand River, Ontario (eastern basin)

Description: A study is currently taking place to assess the feasibility of using treatment wetlands to polish WPCP effluent from the Brantford, Caledonia, Cayuga and

Dunnville plants. This study will address the current loading rates of nutrients to the river from these plants, the potential reduction loads treatment

wetlands could provide if located at these four sites, and the cost/benefits of these systems for habitat and other functions compared to conventional

systems.

Lead Agency: OMNR (LEMU)

Contact: Janice Gilbert or Kurt Oldenburg; OMNR Lake Erie Management Unit, P.O. Box 429 Port Dover, ON, N0A 1N0

Partners: 6-Nations Ecocentre, MOE, Haldimand-Norfolk Stewardship council, Environment Canada

Links:

Documents Reference #12

Niagara River

Project Title Project Type Basin Waterbody(ies) Status

Niagara River (Ont) AOC Wetland Habitat monitoring and East basin Niagara River Summer 2006

Assessment evaluation

Location: Niagara River

Description: Wetland assessments and ranking with a focus on the Welland R. watershed.

Lead Agency: OMNR (Niagara office)

Contact: A. Yagi, OMNR, 4890 Victoria Avenue North, Vineland Station, Ont. L0R 2E0

Partners:

Links: http://www.epa.gov/niagara-river-aoc

Documents


Niagara River AOC (Ont) Fisheries Habitat monitoring and East basin Niagara River Fieldwork Complete (2003-

Assessment evaluation 2005). Reporting spring 2006

Location: Niagara River (CAN)

Description: Assessment of fisheries and fish habitat including wetlands in selected areas throughout the AOC. Selection of sites, development of methodology,

electrofishing (both boat and backpack).

Lead Agency: OMNR (Niagara office)

Contact: A. Yagi, OMNR, 4890 Victoria Avenue North, Vineland Station, Ont. L0R 2E0

Partners: Land Care Niagara, Eco Program

Links: http://www.epa.gov/niagara-river-aoc

Documents

Niagara

Project Title Project Type Basin Waterbody(ies) Status

Drapers Creek Barrier Removal Rehabilitation Projects East basin n/a Initially April 2003-2006

(Implementation)

Location: Welland River watershed

Description: Barrier removal project in the lower portion of 12:12 creek (tributary to the Welland River, part of Niagara AOC above N. Falls). Barrier by erosion of the creek

bed resulting in a perched culvert. Impacting known sports fish migration.

Lead Agency: OMNR (Niagara) /NPCA

Contact: J. Durst; OMNR Vineland Area Office, Vineland, Ontario

Partners:

Links:

Documents


Lyons Creek Watershed Study Habitat monitoring and East basin n/a Fieldwork Complete (2003-

evaluation 2005); Reporting 2006

Location: Welland River watershed

Description: Watershed habitat study on Lyon’s Creek (tributary of the Welland River, Niagara AOC) in order to evaluate existing natural areas and determine hydrology

regime.

Lead Agency: OMNR (Niagara)/NPCA

Contact: A. Yagi, OMNR, 4890 Victoria Avenue North, Vineland Station, Ont. L0R 2E0

Partners:

Links:

Documents

Upper Grand, Lower Grand

Project Title Project Type Basin Waterbody(ies) Status

Grand River Ecosystem Multi-Partner Habitat monitoring and East basin n/a Fieldwork complete. Review of

Initiative for Assessment, evaluation 2000-2005 assessment

underway. 2007: Agency and

Monitoring and Rehabilitation stakeholder workshops and

development of habitat

rehabilitation strategy

Location: Grand River, Ontario (eastern basin)

Description: Field work and reporting of fisheries and aquatic habitat concerns in the Grand River, towards the development of a strategy for ecosystem rehabilitation.

Including: 1) Water quality 2) Fish migration & habitat use and refuges 3) Fish community IBI and SAR reporting and 4) evaluation of fishway performance to

restore natural reproduction of walleye stock. Contributing to “State of” Reporting and the refining of rehabilitation targets and recommendations for

reaching them (stream rehab, WPCP operation and reservoir discharge management).

Lead Agency: OMNR-LEMU (Assessment) and EC (LE LaMP Strategy)

Contact: T. MacDougall, OMNR Lake Erie Management Unit, P.O. Box 429 Port Dover, ON, N0A 1N0

Partners: GRCA, MOE, EC, DFO, OFAH

Links:

Documents i) "State of the Southern Grand River"; Summer 2007. ii) Completion Reports (water quality, fish community); spring 2007; iii) walleye habitat; Reference #3

Upper Grand, Lower Grand, Big Creek, Niagara

Project Title Project Type Basin Waterbody(ies) Status

Ontario Stewardship Initiatives Rehabilitation Projects East basin n/a Ongoing

(Implementation)

Location: Watersheds draining into L. Erie (Grand River, Welland River, Long Point Complex,

Description: Implementation of Best management practices, Environmental Farm practices and riparian recovery on watersheds draining into Lake Erie

Lead Agency: OMNR/ Stewardship Ontario (Haldimand-Norfolk, Brant, Waterloo-Wellington Counties)

Contact:

Partners:

Links:

Documents


^^back to top


GLFC Interactive Video
Great Lakes Image Gallery

Photo of fish eggs Photo: American Fisheries Society